Streambank Stabilization

sylvan glen golf course hrc project

The Sylvan Glen Golf Course, constructed in 1922, was experiencing negative impacts from storm water runoff generated by increased development in upstream tributary areas. These impacts included increased bank erosion, loss of vegetation within the drain channel, exposed irrigation and drainage infrastructure, loss of tee surfaces and increased downstream sedimentation…

Facilities Tunnel Surveying

tunnel surveying

HRC provided tunnel surveying, design and construction observation for the Birmingham Combined Sewer Overflow (CSO) control facilities, constructed as part of an $82 million national demonstration project. The demonstration project is a three-phase project aimed at eliminating CSOs in the Rouge River watershed. The Birmingham Retention Treatment Basin…

Road Resurfacing & Bridge Rehabilitation

I94 road resurfacing

This project included mill and resurfacing of I-94 from Gratiot Avenue to 8 Mile Road; and the rehabilitation of 28 bridges along this stretch of I-94 in Detroit. Resurfacing included pavement joint repairs, drainage structure repairs and adjustment, HMA overlay, and permanent pavement markings. The bridge rehabilitation portion of the project included…

Sanitary Sewer Improvements

busha highway sanitary sewer improvement by hrc

Hubbell, Roth & Clark, Inc. (HRC) was commissioned by the City of Marysville to provide professional design and construction engineering services to replace a 1,200 foot section of an existing 18” diameter sanitary sewer trunk line with a 24” diameter PVC pipe. This project eliminated a “bottleneck” that was previously identified…