This project included mill and resurfacing of I-94 from Gratiot Avenue to 8 Mile Road; and the rehabilitation of 28 bridges along this stretch of I-94 in Detroit. Resurfacing included pavement joint repairs, drainage structure repairs and adjustment, HMA overlay, and permanent pavement markings. The bridge rehabilitation portion of the project included…
Sanitary Sewer Improvements
Hubbell, Roth & Clark, Inc. (HRC) was commissioned by the City of Marysville to provide professional design and construction engineering services to replace a 1,200 foot section of an existing 18” diameter sanitary sewer trunk line with a 24” diameter PVC pipe. This project eliminated a “bottleneck” that was previously identified…
Relief Drain Restoration
The Rummell Drain was constructed in the late 1960s to provide storm drainage relief to portions of the City of Southfield, Lathrup Village and the Village of Beverly Hills. The Drain services approximately 3,300 acres and is almost 20,500 feet in length. Utilizing computer modeling, HRC completed a study of the Drain in the late 1990s to address…
Cedar Springs Fire Station
The City of Cedar Springs engaged HRC to provide design engineering and construction administration to create their new 10,000 square foot fire station headquarters.